Saturday, 11 September 2010

A short history





Since this Blogspot is new I will try and fill in a very brief history before starting a series of new frequent updates. The CYE website cye.org.uk provides a lot of history up to the fitting out stage and please have a look at that. Information on fitting out has been a bit sparse so hopefully this will fill in that gap somewhat.

We went out to tender to several companies but finally selected Trimline of Southampton. They are experienced ship and superyacht fitters and have some land building experience too. The have a large workforce and have a reputation for quality of work which is proving to be the case.

Fitting out started in earnest in June and one of the first jobs was to fit the insulation and most of the wiring. The photo shows wires hanging everywhere. There are wires for lights, wires for power, wires for data transmission and wires for fire alarm system.

Then came the panelling stage. These were all cut to fit perfectly, with boxes round the portholes and the windows all made back at Trimline’s factory in Southampton. Photo will show some panelling.

Plumbing was started with pipes for hot and cold water, pipes for evacuation of waste water and large plastic piles for the ventilation system. You can probably identify some of this in the photo.

There were workmen everywhere on some days. Trimline employed specialist subcontractors, selected by us and this was all coordinated by Trimline’s site manager with weekly co-ordination meetings to ensure Project Management. Trimline have a strict control of safety and risk assessment and every worker who comes on the ship has to use a swipe card which gets recorded on computer.

Quite a bit of welding and steel cutting was involved at this stage, in order to get the pipes and wires through the right places in the lower deck. We controlled the welding work direct and had to get Hot Work permits to ensure that there was acceptable risk against fire.


David Edwards, Project Manager for ship replacement.

Friday, 10 September 2010

Maritime Coastguard Agency Approvals!


















A major piece of the jigsaw has been fitted this Thursday. An MCA inspector came to the new ship and has issued a certificate for towing to Chichester. In the afternoon he came to The Gerald Daniel and we watched in trepidation as he surveyed the hull, bilges and deck. He has issued a certificate for towing in the Solent area with only minor preparatory works, mainly sealing openings and hatches!!



Without these certificates the boats could not be moved. A method study for the ship movements has been agreed by all parties including Chichester Harbour and planning department. Pictures show survey in action and bilges of GD which rarely see light of day.
Norman Doney

New ship progress



Hi, I am David Edwards and I am Project Managaer for the Project Enterprise. I hope to update progress from now on most days. Watch this space. Pictures show ship alongside at low tide, sitting on the mud and the other of the wheelhouse with ship's wheel.

Tuesday, 7 September 2010

New Ship Project

Hi
Norman Doney, Executive Director of Christian Youth Enterprises sailing Centre here.
This blog will be used to countdown with regular news and pictures as the new ship moves to completion by 30th September. It will also update you on movement of the Gerald Daniel and the New Ship and other works.
This is going to be a strategic, exciting and ground breaking 3 months. Hang on in there!!

Welcome

Hello, and welcome to CYE Sailing Centres new ship blog, over the next month we'll be counting down to the completion of our new accomodation vessel, and we'll try to get a post up every day to keep you in touch with progress on the project, so keep checking back!

if you want to know more about the project, theres loads of info on our website at www.cye.org.uk/barge.htm