This week is a hive of activity.
The site at CYE is turned into a construction project with lots of mud, diggers, dump truck etc.
The mooring struts arrive by truck from Walcon Marine.
The two gangways arrive all the way from the Tyne on the North East coast.
The mooring wires are being fixed to the ship ready to be attached to mooring frames on shore.
The fitting out of the ship is on hold for several days until it is properly moored, but should re-commence by Trimline sometime next week.
David Edwards. Project Manager