Yes after all the excitement of the safe arrival of RESOLUTE on Saturday, work started today on preparations for final commissioning and asociated site works.
Lots of machinery and deliveries of stones arrived too.
David Edwards supervised the placing of the mooring frames and wires which will have struts attached to secure the ship in place. Later this week 450mm diametre holes will be drilled down through the sea wall and filled with steel and concrete to hold the frames in place. Further mud levelling work will continue this week too. Meanwhile while Kevin Nash and Nick (the Kog) Pyke organised a work party preparing a drained Rib storage area which is currently boggy whenever it rains.
Norman Doney